3” settlement of a large, heavily reinforced parking garage ramp slab
The Solution
Utilize Polymer to compress and densify the subgrade to lift the ramp back to level
The Impact
Mitigated need to remove and replace the slab. Slab was successfully lifted 3″.
The Challenge
3” Settlement of a large, heavily reinforced parking garage ramp slab
The project faced a significant challenge with a 3-inch settlement of a large, heavily reinforced parking garage ramp slab, which had caused noticeable unevenness and potential structural concerns. The settlement was particularly problematic due to the complex reinforcement within the slab, which included thick steel mesh and rebar designed to support the heavy loads of vehicles and traffic. This made traditional methods of repair, such as slab replacement, both costly and disruptive. The settlement not only compromised the functionality and safety of the ramp but also threatened the long-term stability of the surrounding structure. Addressing this issue required a precise and efficient solution to lift and level the slab without disturbing the intricate reinforcement and while minimizing downtime for the garage.
Key Facts
3″
Slab Lifting
6 Hours
Installation Time
0 hours
Business Operations Interruption
3′
Polyurethane Injection Depth


The Solution
Polymer was injected to stabilize the subgrade and lift the ramp back to level
The solution involved using polymer, a high-performance injection material, to compress and densify the subgrade beneath the ramp. This process effectively stabilized the foundation, filling voids and reinforcing the soil structure. By injecting the polymer beneath the settled slab, the material expanded and hardened, lifting the ramp back to its original level while providing long-term support. The use of polymer not only restored the ramp’s functionality but also minimized disruption, offering a cost-effective, non-invasive alternative to slab replacement.
The Impact
Injection method lifts and levels slab, avoiding costly replacement
The project significantly mitigated the need for costly slab removal and replacement by utilizing injection methods. Within just 15 minutes of the injections, the slab was fully ready for use. The process successfully lifted the slab by 3 inches, restoring it to its original grade and leveling it to provide a stable and durable surface. This approach not only saved time and resources but also ensured minimal disruption while achieving the desired structural integrity.