The Challenge

A major trip hazard developed along a Weis Markets’ main entrance.

The Solution

The polyurethane injections process was used to cost-effectively and quickly lift and align all 70+ sidewalk panels.

The Impact

Groundworks technicians lifted and aligned the sidewalk in one day without disturbing Weis’ operations.

MapPin Icon Location: Linglestown, PA

House Icon Project Type: Retail

Wrench Tool Icon Repair Type: Soil Stabilization


The Challenge

A major trip hazard developed along a Weis Markets’ main entrance.

Founded in 1912, Weis Markets is a food retailer based in Pennsylvania that strives to minimize environmental impact, bring the very best in nutrition and healthy food to their markets, and deliver the highest level of customer experience and satisfaction. At one Weis location in Linglestown, Pennsylvania, a major trip hazard developed along the sidewalks and curbing on both sides of the store entrance. This settlement posed a hazard to the public and Weis’ customers, so Weis decided to take action to repair the sidewalks.

The settled sidewalks outside the Weis store were built above a culvert, and this caused about 70 sections of the sidewalk (210 linear feet ) to settle as much as 3.5 inches over time. Weis needed a solution that could raise each sidewalk panel to be even with the curb, align each panel to adjacent panels, not disturb the metal safety railing embedded in the sidewalks, minimize disruption to their customers, and not compromise their commitment to the environment. Weis hired Groundworks because they were the only company able to meet all of these job criteria.

Key Facts

70 +

Sidewalk Sections

1 Day

Installation Time

0

Business Interruption

3.5 Inches

Settlement


The Solution

The polyurethane injections process was used to cost-effectively and quickly lift and align all 70+ sidewalk panels.

The polyurethane injections process was used to cost-effectively and quickly lift and align all 70+ sidewalk panels. In some areas, multiple injections were needed due to the degree of settlement. Upon completion of the sidewalk lifting, all injection points and gaps between panels were sealed.

The Impact

Groundworks technicians lifted and aligned the sidewalk in one day without disturbing Weis’ operations.

In just one business day, Groundworks technicians lifted and aligned the sidewalk to curb height for all 70+ settled panels. The project was completed without disturbing Weis’ operations, and the work was done in sections to minimize disruptions to customer traffic. The embedded metal railing was not disturbed in any way, thereby keeping the visual appeal and safety of the railing intact. In addition, the environmentally friendly materials used in the repair kept Weis Markets’ commitment to the environment intact. In the end, the project restored the aesthetics and safety of the sidewalk while also reducing the amount of future maintenance required. Groundworks not only restored a sidewalk, but also Weis Markets’ mission of excellent customer service and commitment to the environment.