In January '25 we had Anthony (foreman), Richard, and Ty do an amazing job with our crawlspace encapsulation. It was a bumpy road and this…
In January '25 we had Anthony (foreman), Richard, and Ty do an amazing job with our crawlspace encapsulation. It was a bumpy road and this crew excellently handled issues as they came up and masterfully completed the encapsulation. Very impressed with the leadership and communication from Anthony. He's very passionate and about his work and extremely capable of getting difficult jobs done.
For future customers, expect a few months to be able to get a similar job done. Steve H estimated the project and there were no hidden fees or surprises, we appreciate his work as well and the transparency in that process.
The “Monstars” George, Russell and Kade bent over backwards, dug half way to the core of the earth, twice, borrowed materials from other…
The “Monstars” George, Russell and Kade bent over backwards, dug half way to the core of the earth, twice, borrowed materials from other trucks and never fussed or complained when their dumpster was delivered to them 2 days late? Absolute installation professionals compared to the troubles we had with the office contracts and sales teams providing the actual work we asked, signed and paid for.
We were impressed with George’s leadership, words of encouragement and very positive attitude when our water problems were much deeper and greater than usual. All 3 team members were absolute professionals. Calling in 3 more support members on day 5 to get our pumps running introduced friendly and hard workers and overtime hours to get us functional as fast as possible. George, Russell and Kade are an asset with never a complaint even with an extensive change order I asked for last minute on day 8 of a 4-day project. The change order worked out even better than envisioned with their installation solutions.
Maybe these 3 will end up running the office sooner than later with their excellent attitudes of “we’ll make it happen, boss.” “No problem at all”… on day 8 of a 4-day project. That positive attitude showing through all of the exhaustion, mud and water carried to fill their entire dumpster.
Ya’ll deserve a bonus after this one! We are elated we finally have a dry basement floor and can remodel and move back in.